Skip to content

Deliverables

Deliverables

Reference: VLN-2026-PCC-001-DEL | Version: 1.0.0


Deliverable Package

IDDeliverableFormatDelivery
D1Platform Security Audit ReportPDF + MarkdownEnd of Week 6
D2Smart Contract Audit ReportPDF + MarkdownEnd of Week 5
D3Wallet Flow Risk ModelPDF + Dune dashboardEnd of Week 3
D4Remediation TrackerGitHub Issues + CSVWith D1
D5Re-test Report (conditional)PDF addendumPost-remediation

D1 — Platform Security Audit Report

Contents:

  • Executive summary (board-level, non-technical)
  • Threat model diagram
  • Full findings list with CVSS scores
  • Per-finding technical writeup (description, impact, PoC, remediation)
  • Risk heat map
  • Remediation priority matrix
  • Appendix: tool output, raw scan results

Target length: 40–80 pages


D2 — Smart Contract Audit Report

Contents:

  • Contract-by-contract coverage summary
  • Automated analysis results (deduplicated)
  • Manual audit findings with annotated code snippets
  • PoC exploit scripts for Critical/High findings (Foundry format)
  • Gas optimization recommendations

Target length: 30–60 pages


D3 — Wallet Flow Risk Model

Contents:

  • Transaction graph visualization
  • Cluster analysis results (sybil candidates, anonymized)
  • Wash-trading signal strength measurement
  • Bonus abuse vector enumeration
  • Recommended detection thresholds

Format: PDF + interactive Dune dashboard (read-only access)


D4 — Remediation Tracker

Pre-populated GitHub Issues tagged by severity, component, remediation complexity, and recommended fix owner. Designed for direct import into PeraltaCC’s engineering workflow.


D5 — Re-test Report

PeraltaCC may submit remediated code for re-test of Critical and High findings within 30 days of initial delivery. VLN confirms fix efficacy and issues a signed addendum.


Delivery Timeline

DeliverableDate
D3 — Wallet Flow Risk Model2026-05-30
D2 — Smart Contract Audit Report2026-06-13
D1 — Platform Security Audit Report2026-06-20
D4 — Remediation Tracker2026-06-20
D5 — Re-test ReportTBD (max 2026-07-20)

Acceptance Criteria

PeraltaCC may reject a deliverable if required sections are missing, findings lack reproduction steps, or CVSS scores are absent. VLN resolves deficiencies within 5 business days of rejection notice.


Next: Timeline